Discover
Client brief, site assessment, spatial audit and benchmarking. Every engagement starts here — no shortcut past documented discovery.
The integrated design-build delivery model that carries every Pencil Sketch engagement — from the first concept sketch to the last switch wired at handover — laid out on a single page. Four delivery stages, six design capabilities, eight built capabilities, four operating- discipline pillars, four differentiators.
Pencil Sketch operates as an integrated design-build studio. Design + construction sit under one accountable contract, one team, one delivery cadence. Four stages: Discover → Design → Detail → Deliver. Timeline compresses 20–30% vs traditional design-bid-build. Fixed- price contract after design development. No coordination gaps between drawing and site because the same studio holds both.
Client brief, site assessment, spatial audit and benchmarking. Every engagement starts here — no shortcut past documented discovery.
Concept development, space planning, material selection. Design development produces the specification catalogue against which the fixed-price contract is set.
Technical documentation, MEP coordination, BOQ. Long-lead procurement starts here — before construction mobilisation.
Construction management, quality control, snag list, handover. Single-team accountability from first drawing to move-in-ready condition.
Occupancy analysis, adjacency planning, agile neighbourhoods, post-occupancy review. Briefs that survive contact with the floor plate.
Concept-to-completion. Material specification, lighting, FF&E, brand integration. Specified to a zero-snagging standard.
Collaboration spines, focus pods, experience zones, flexible configurations. Plans engineered around how people actually work.
Single-point accountability, vendor coordination, milestone tracking. The pencil that drew the first line owns the last switch.
In-house construction ensures design fidelity, cost control and pace. One team. One contract. One handover date that holds.
Ergonomic planning, custom joinery, acoustic detailing, technology integration. The visible 10% backed by the invisible 90%.
Partitions, screeds, flooring, plastering, waterproofing and structural glazing.
Power, lighting, UPS, DG sync, data and network containment backbone.
VRV/VRF, ducting, fresh-air, supply lines and drainage works.
Detection, sprinklers, suppression and statutory code compliance.
Custom carpentry, veneers, acoustic panels and loose-furniture installation.
Snagging, testing, commissioning and clean, move-in-ready handover.
Mobilisation, GFC drawings, sequencing and on-site supervision.
Material sourcing, vendor onboarding and supply-chain coordination.
One site PM owns sequencing, RA bills, vendor control and timelines. No hand-offs. No excuses.
Material approvals, stage checklists, testing and third-party inspection embedded in the delivery workflow.
PPE discipline, barricading, height, electrical and hot-work protocols enforced from mobilisation through handover.
Dust control, on-site waste segregation and minimal-landfill disposal as the working standard.
One team from concept to commissioning — no coordination gaps, no lost design intent.
The integrated model compresses timelines by 20–30% vs traditional design-bid-build approaches.
Spatial decisions backed by occupancy data, workflow analysis and experience mapping.
40+ projects across technology, lifesciences and enterprise sectors with execution confidence.